Opens in a new tab
DEVELOPMENT ADVISORY · FEASIBILITY & 3-in-1 DPR

Know what your land can support. Before you commit.

A structured feasibility and DPR advisory that evaluates planning potential, development constraints and project economics for informed, capital-efficient decisions.

MAVEX contemporary commercial architectural building at sunset overlooking city and hills
3-in-1 DPR
A consolidated assessment across regulatory, technical and financial dimensions.

Regulatory

Planning & statutory context

Technical

Development potential & constraints

Financial

Cost, revenue & viability

PRE-DEVELOPMENT RISK REALITY

Why 60% of real estate capital errors occur in the first 45 days.

A development plan based on optimistic broker assumptions rather than empirical statutory underwriting leads to stranded capital, non-viable FSI purchase, and regulatory gridlock.

02

Aviation & Environmental Funnels

Navi Mumbai International Airport (NMIA) obstacle limitation contours and coastal CRZ/mangrove buffers impose rigid development ceilings that frequently prevent full utilization of permissible FSI.

03

Unhedged Inflation & Cost Phasing

Generic pro-formas ignore micro-market municipal premium payment schedules, CIDCO transfer charges, and construction commodity inflation buffers, resulting in cash crunches midway through approvals.

THE 3-IN-1 DPR FRAMEWORK

Four integrated workstreams. Zero planning blind spots.

Click between the workstreams to inspect how our Detailed Project Reports eliminate statutory, architectural, and financial risks before capital deployment.

Statutory DP & Zoning Underwriting

Direct verification of plot boundaries against official Development Plans (DP) and regional master plans to establish absolute statutory boundaries.

  • Unified DCPR 2020 & CIDCO GDCR Regulation matching
  • Reservation verification (Green zones, school/hospital buffers, DP roads)
  • Base FSI, Premium FSI, and TDR absorption limits
  • Airport Authority of India (AAI) NMIA obstacle limitation surfaces
Workstream Deliverables
Authority Scope CIDCO / NMMC / NAINA
Base Code UDCPR 2020 Reg. 3.1 & 7.3
Road Benchmark 9m to 24m+ Multiplier Matrix
Output Artifact Cadastral Boundary Overlay Sheet

Architectural Massing & Spatial Envelope

Translating theoretical statutory potential into buildable, sellable, and structurally efficient floorplates.

  • Core-to-carpet efficiency optimization (target 78%–84%)
  • Basement and podium parking envelope analysis
  • Height vs footprint sensitivity modeling
  • Residential vs Commercial product mix trade-off analysis
Spatial Efficiency Benchmark
Efficiency Ratio 78% – 84% Usable Carpet
Parking Model Podium + Basement Multi-tier
Height Envelope Aero-Funnel Strict Clearance
Output Artifact 3D Massing & FAR Schedule

Financial Sensitivity & DCF Underwriting

Rigorous mathematical stress-testing under varying market conditions, construction costs, and sales velocities.

  • 24–36 month dynamic Discounted Cash Flow (DCF) modeling
  • IRR, MoIC, and Peak Capital Exposure calculation
  • Construction material inflation sensitivity (+/- 15%)
  • Absorption rate sensitivity under conservative sales velocity
Financial Hurdle Targets
Target Project IRR 18.5% – 24.0% p.a.
Inflation Buffer 15% Commodity Hedge Model
Cashflow Timeline Monthly Milestone Schedule
Output Artifact Dynamic Excel Underwriting Model

Municipal Approvals Roadmap & Phasing

A crystal-clear chronological Gantt chart of statutory permissions, authority fees, and milestone prerequisites.

  • CIDCO / NMMC / NAINA pre-submission clearance sequence
  • CFO Fire NOC, Tree Authority, and Environmental Clearance (EC) roadmap
  • IOD & Commencement Certificate (CC) milestone schedule
  • MahaRERA registration documentation readiness package
Approval Milestones
Pre-requisite NOCs CFO, AAI, MoEF, Traffic
Sanction Sequence IOD → Plinth CC → Full CC
RERA Readiness Form 1, 2, 3 Certification
Output Artifact Statutory Approval Gantt Chart
INTERACTIVE PLANNING TOOL

UDCPR 2020 Potential & FSI Estimator Widget

Select road access width and plot size to instantly estimate potential gross buildable potential under Maharashtra's Unified Development Control Regulations.

ESTIMATED MAXIMUM POTENTIAL
2.00 FSI
Maximum Permissible FSI (Base + Premium + TDR + Ancillary)
Plot Area: 4,000 sq. m (43,056 sq. ft.)
Max Permissible Built-up Area: 86,112 sq. ft.
Estimated Usable Carpet (80%): 68,890 sq. ft.
Ancillary FSI Scope: Up to 60% on Payment
DPR EXECUTION METHODOLOGY

The disciplined 7-stage sequence from survey to boardroom.

Every MAVEX Detailed Project Report follows an unyielding investigative process designed for investor boardrooms and institutional credit committees.

01

Cadastral & Land Survey Reconnaissance

STAGE 01 • DAYS 1–7

Physical site inspection, ETS digital boundary mapping, road width measurement at entry nodes, and verification of high-tension line or water body buffers.

02

Statutory Potential & FSI Calculation

STAGE 02 • DAYS 8–14

Mathematical calculation of Base FSI, Additional Premium FSI, TDR loading capacity, and Ancillary FSI as per Unified DCPR 2020 road-width classifications.

03

Architectural Scenarios & Massing Study

STAGE 03 • DAYS 15–21

Formulation of 2 to 3 conceptual massing options (low-rise high-density vs high-rise tower) to benchmark spatial efficiency and parking feasibility.

04

Cost Benchmarking & Premium Phasing

STAGE 04 • DAYS 22–26

Local contractor specification benchmarking, CIDCO transfer charges, premium FSI installment timeline, and municipal scrutiny fee schedule.

05

Dynamic Cashflow & IRR Underwriting

STAGE 05 • DAYS 27–32

Construction of a fully linked financial model simulating monthly cash in-outflows, debt servicing requirements, and stakeholder profit distribution.

06

Regulatory Review with Town Planners

STAGE 06 • DAYS 33–37

Consultation with empaneled licensed architects and town planning consultants to validate all interpretations against current municipal circulars.

07

Final Boardroom DPR Executive Dossier

STAGE 07 • DAYS 38–42

Delivery of the comprehensive bound and digital 3-in-1 DPR, executive slide deck, and financial sensitivity spreadsheet ready for investment committee sign-off.

TANGIBLE EVIDENCE REGISTER

The four core deliverable artifacts you receive.

No abstract opinions. You receive rigorous, reviewable documentation that forms the legal and financial bedrock of your project.

ARTIFACT 01

Statutory DP & FSI Overlay Sheet

Official Development Plan extraction, road reservation overlay, and tabular breakdown of permissible FSI categories.

ARTIFACT 02

Architectural Massing & Efficiency Book

3D conceptual massing diagrams, core-to-carpet efficiency schedules, and parking configuration matrices.

ARTIFACT 03

Dynamic Financial Sensitivity Model

Interactive Excel workbook featuring 24–36 month cashflows, IRR hurdles, and scenario toggle switches.

ARTIFACT 04

Municipal Approvals Gantt & Cost Phasing

Chronological statutory permissions timeline with exact municipal installment payment milestones.

REGULATORY GEOGRAPHIES

Navi Mumbai & NAINA planning jurisdictions.

Deep, node-specific expertise across planning authorities, municipal corporations, and Special Planning Authorities (SPA).

CIDCO & NMMC JURISDICTION

Kharghar BKC-2 & Belapur

High-density commercial and residential development nodes. Specific expertise in CIDCO leasehold transfer rules, commercial FSI multipliers, and Metro corridor transit-oriented development (TOD).

NMMC DP / CIDCO GDCR / UDCPR 2020
AEROTROPOLIS & SPA JURISDICTION

Ulwe, Dronagiri & Pushpak Nagar

Directly impacted by NMIA aviation height contours, coastal regulations (CRZ), and JNPA freight corridors. Rigorous statutory height calculation is non-negotiable.

NMIA Aerotropolis / AAI Funnel / CIDCO SPA
TOWN PLANNING SCHEMES

NAINA TPS 1 to 12 & Panvel Fringe

Navi Mumbai Airport Influence Notified Area. Special Planning Authority regulations, land pooling surrender ratios (60:40 formula), and TPS final plot reconstitution rules.

NAINA Interim / Sanctioned TPS Regulations
PRIVATE ADVISORY MANDATE

Commission a Development Feasibility Study or 3-in-1 DPR

Engage MAVEX REALTY for an independent, mathematically rigorous assessment of your land parcel or development proposal. All discussions and submissions are governed by strict confidentiality.

Fiduciary Independence Guarantee MAVEX REALTY operates as an independent fiduciary advisor. We do not accept undisclosed broker commissions or represent developer sales quotas. Our underwriting is objective, verifiable, and empirical.

Direct consultation available with Principal Advisor Shahnawaz Alam for qualified institutional mandates and land parcels exceeding 1 acre.

Statutory Compliance & Fiduciary Demarcation: MAVEX REALTY operates under MahaRERA Registration No. A031332600468. Detailed Project Reports (DPR) and feasibility studies are prepared as strategic advisory intelligence. All legal title search reports, conveyance deeds, and formal statutory documentation are executed exclusively by empaneled High Court advocates and registered licensed town planning consultants. We do not provide speculative financial return guarantees.

Bring your next real estate decision into clearer focus.

Direct mandate representation, institutional development DPRs, and pre-leased assets across Navi Mumbai & MMR.

Request private consultation