Know what your land can support. Before you commit.
A structured feasibility and DPR advisory that evaluates planning potential, development constraints and project economics for informed, capital-efficient decisions.
Regulatory
Planning & statutory context
Technical
Development potential & constraints
Financial
Cost, revenue & viability
Why 60% of real estate capital errors occur in the first 45 days.
A development plan based on optimistic broker assumptions rather than empirical statutory underwriting leads to stranded capital, non-viable FSI purchase, and regulatory gridlock.
Road Width & FSI Multiplier Pitfalls
Under UDCPR 2020, potential FSI (Base + Premium + TDR + Ancillary) scales strictly with gazetted road access width. Calculating on expected rather than gazetted width causes catastrophic overpayment for land that cannot be redeemed.
Aviation & Environmental Funnels
Navi Mumbai International Airport (NMIA) obstacle limitation contours and coastal CRZ/mangrove buffers impose rigid development ceilings that frequently prevent full utilization of permissible FSI.
Unhedged Inflation & Cost Phasing
Generic pro-formas ignore micro-market municipal premium payment schedules, CIDCO transfer charges, and construction commodity inflation buffers, resulting in cash crunches midway through approvals.
Four integrated workstreams. Zero planning blind spots.
Click between the workstreams to inspect how our Detailed Project Reports eliminate statutory, architectural, and financial risks before capital deployment.
Statutory DP & Zoning Underwriting
Direct verification of plot boundaries against official Development Plans (DP) and regional master plans to establish absolute statutory boundaries.
- Unified DCPR 2020 & CIDCO GDCR Regulation matching
- Reservation verification (Green zones, school/hospital buffers, DP roads)
- Base FSI, Premium FSI, and TDR absorption limits
- Airport Authority of India (AAI) NMIA obstacle limitation surfaces
Architectural Massing & Spatial Envelope
Translating theoretical statutory potential into buildable, sellable, and structurally efficient floorplates.
- Core-to-carpet efficiency optimization (target 78%–84%)
- Basement and podium parking envelope analysis
- Height vs footprint sensitivity modeling
- Residential vs Commercial product mix trade-off analysis
Financial Sensitivity & DCF Underwriting
Rigorous mathematical stress-testing under varying market conditions, construction costs, and sales velocities.
- 24–36 month dynamic Discounted Cash Flow (DCF) modeling
- IRR, MoIC, and Peak Capital Exposure calculation
- Construction material inflation sensitivity (+/- 15%)
- Absorption rate sensitivity under conservative sales velocity
Municipal Approvals Roadmap & Phasing
A crystal-clear chronological Gantt chart of statutory permissions, authority fees, and milestone prerequisites.
- CIDCO / NMMC / NAINA pre-submission clearance sequence
- CFO Fire NOC, Tree Authority, and Environmental Clearance (EC) roadmap
- IOD & Commencement Certificate (CC) milestone schedule
- MahaRERA registration documentation readiness package
UDCPR 2020 Potential & FSI Estimator Widget
Select road access width and plot size to instantly estimate potential gross buildable potential under Maharashtra's Unified Development Control Regulations.
The disciplined 7-stage sequence from survey to boardroom.
Every MAVEX Detailed Project Report follows an unyielding investigative process designed for investor boardrooms and institutional credit committees.
Cadastral & Land Survey Reconnaissance
STAGE 01 • DAYS 1–7Physical site inspection, ETS digital boundary mapping, road width measurement at entry nodes, and verification of high-tension line or water body buffers.
Statutory Potential & FSI Calculation
STAGE 02 • DAYS 8–14Mathematical calculation of Base FSI, Additional Premium FSI, TDR loading capacity, and Ancillary FSI as per Unified DCPR 2020 road-width classifications.
Architectural Scenarios & Massing Study
STAGE 03 • DAYS 15–21Formulation of 2 to 3 conceptual massing options (low-rise high-density vs high-rise tower) to benchmark spatial efficiency and parking feasibility.
Cost Benchmarking & Premium Phasing
STAGE 04 • DAYS 22–26Local contractor specification benchmarking, CIDCO transfer charges, premium FSI installment timeline, and municipal scrutiny fee schedule.
Dynamic Cashflow & IRR Underwriting
STAGE 05 • DAYS 27–32Construction of a fully linked financial model simulating monthly cash in-outflows, debt servicing requirements, and stakeholder profit distribution.
Regulatory Review with Town Planners
STAGE 06 • DAYS 33–37Consultation with empaneled licensed architects and town planning consultants to validate all interpretations against current municipal circulars.
Final Boardroom DPR Executive Dossier
STAGE 07 • DAYS 38–42Delivery of the comprehensive bound and digital 3-in-1 DPR, executive slide deck, and financial sensitivity spreadsheet ready for investment committee sign-off.
The four core deliverable artifacts you receive.
No abstract opinions. You receive rigorous, reviewable documentation that forms the legal and financial bedrock of your project.
Statutory DP & FSI Overlay Sheet
Official Development Plan extraction, road reservation overlay, and tabular breakdown of permissible FSI categories.
Architectural Massing & Efficiency Book
3D conceptual massing diagrams, core-to-carpet efficiency schedules, and parking configuration matrices.
Dynamic Financial Sensitivity Model
Interactive Excel workbook featuring 24–36 month cashflows, IRR hurdles, and scenario toggle switches.
Municipal Approvals Gantt & Cost Phasing
Chronological statutory permissions timeline with exact municipal installment payment milestones.
Navi Mumbai & NAINA planning jurisdictions.
Deep, node-specific expertise across planning authorities, municipal corporations, and Special Planning Authorities (SPA).
Kharghar BKC-2 & Belapur
High-density commercial and residential development nodes. Specific expertise in CIDCO leasehold transfer rules, commercial FSI multipliers, and Metro corridor transit-oriented development (TOD).
NMMC DP / CIDCO GDCR / UDCPR 2020Ulwe, Dronagiri & Pushpak Nagar
Directly impacted by NMIA aviation height contours, coastal regulations (CRZ), and JNPA freight corridors. Rigorous statutory height calculation is non-negotiable.
NMIA Aerotropolis / AAI Funnel / CIDCO SPANAINA TPS 1 to 12 & Panvel Fringe
Navi Mumbai Airport Influence Notified Area. Special Planning Authority regulations, land pooling surrender ratios (60:40 formula), and TPS final plot reconstitution rules.
NAINA Interim / Sanctioned TPS RegulationsCommission a Development Feasibility Study or 3-in-1 DPR
Engage MAVEX REALTY for an independent, mathematically rigorous assessment of your land parcel or development proposal. All discussions and submissions are governed by strict confidentiality.
Direct consultation available with Principal Advisor Shahnawaz Alam for qualified institutional mandates and land parcels exceeding 1 acre.