DESIGN & BUILD

From Property Strategy to Built Space.

DESIGN & BUILD

A property decision does not end with acquisition. For clients developing, renovating, repositioning or improving a property, MAVEX connects the strategic real estate decision with design, execution and project coordination. Research the property. Define the objective. Design for the use. Build with control.

Strategy • Design • Coordination • Execution
SPEC: ARCHITECTURAL COORDINATION MATRIX
01. GEOMETRY PLAN
02. HABITATION SPACE
03. TACTILITY MATERIAL
04. FIDUCIARY EXECUTION
PREREQUISITE OF VALUE

The Built Outcome Should Begin With the Property Strategy.

PREREQUISITE OF VALUE

A design and build process should not begin with decoration, finishes or predefined packages. It should begin with what the property is intended to achieve, who will use it, what the physical and planning context allows, and how execution will be controlled.

“Good design is not only about appearance. It is about making the property work better for its intended purpose.”

THE ARCHITECTURAL BRIEF INTERFACE 9 CRITICAL PREREQUISITES
01 / OBJECTIVE

What the property is intended to achieve

02 / DEMOGRAPHICS

Who will use the space

03 / STRUCTURAL REALITY

What the existing property allows

04 / STATUTORY FRAMEWORK

What planning considerations apply

05 / CAPITAL ALLOCATION

What the budget needs to accomplish

06 / FUNCTIONAL RESOLUTION

What the design needs to solve

07 / MULTI-TRADE SYNCHRONY

What needs to be coordinated

08 / SITE GOVERNANCE

How execution will be monitored

09 / CONTINGENCY PLANNING

What could affect cost, time or scope

THE REAL ESTATE PERSPECTIVE

Design & Build Within a Real Estate Advisory Ecosystem.

THE REAL ESTATE PERSPECTIVE

MAVEX is not an interior retail showroom, nor are we a general contracting trade crew with equipment to amortize. We are an institutional real estate advisory firm that ensures your capital allocation to physical space creates measurable economic and lifestyle value without procurement conflict.

THE DISCIPLINED PROPERTY PIPELINE
01

PROPERTY

Underwriting & Acquisition parameters

02

OBJECTIVE

Yield, user lifestyle, or hold period

03

PLANNING

Statutory permissions & load constraints

04

DESIGN

Spatial form, light, MEP and finishes

05

BUDGET

BOQ baseline & trade contract terms

06

COORDINATE

Site audit, MEP, QA and milestones

07

REVIEW

Snag closeout & asset operationalization

FIDUCIARY SEQUENCE

From Initial Brief to Execution.

FIDUCIARY SEQUENCE
7-STAGE MASTER INDEX
01

Property & Project Brief

Understand the property, intended use, client objective and project requirements.

02

Existing Property Assessment

Review existing space, physical condition, structural parameters, available drawings, constraints and opportunities.

03

Design Direction

Establish spatial layout, functional planning, architectural character, material direction and design solutions tailored to the property.

04

Budget & Scope

Define project scope, cost framework, bill of quantities (BOQ) parameters, trade packages and procurement approach before work begins.

05

Professional Coordination

Coordinate with architects, interior designers, structural engineers, MEP consultants, contractors and specialist vendors.

06

Execution Support

Monitor physical progress, milestone adherence, quality benchmarks and coordination issues on site.

07

Project Review

Conduct handover review, snagging resolution, final documentation reconciliation and asset operational transition.

TACTILE ARCHITECTURE

Material Integrity & Specification Control

Every finish, veneer, and mechanical fixture is catalogued into a definitive specification schedule prior to contractor procurement, preventing field substitutions.

CASE STUDY: BANDRA RECLAMATION RESIDENCE

Homes Designed Around How They Are Actually Used.

CASE STUDY: BANDRA RECLAMATION RESIDENCE
PRIVATE RESIDENCES

“The starting point is the client’s requirement and the existing property—not a predefined design package.”

Residential execution must reconcile long-term lifestyle ergonomics with technical durability. We oversee the complete spatial lifecycle:

New interiors
Renovation
Space reconfiguration
Home upgrades
Material and finish selection
Furniture and fixture coordination
Lighting considerations
Exterior improvement
Property repositioning for prime private exit
ENTERPRISE INFRASTRUCTURE

Commercial Space Has to Work as Well as It Looks.

ENTERPRISE INFRASTRUCTURE

Corporate architecture is a balance sheet asset. It dictates workforce density, acoustic retention, executive discretion, client brand perception, and leasehold amortization schedules.

INSTITUTIONAL GRADE STANDARDS

Corporate Campuses, Flagships & Headquarters

ASHRAE / NBC / IGBC COMPLIANT
SCOPE COVERAGE
  • • Grade-A Institutional Offices
  • • Executive C-Suite Headquarters
  • • Luxury Retail Flagships
  • • Experience Centers & Sales Pavilions
  • • Private Family Office Chambers
FACILITY OPTIMIZATION

Re-engineering usable carpet efficiency ratios (B/C efficiency), server-grade electrical distribution, and acoustic NR-35 acoustic containment.

PILLAR 01

FUNCTION

Operational efficiency, technical loads, MEP requirements, acoustic zones, and regulatory compliance.

PILLAR 02

FLOW

Circulation patterns, department adjacency, visitor journeys, back-of-house logistics, and security zoning.

PILLAR 03

POSITIONING

Brand alignment, client reception experience, market distinction, and capital value reinforcement.

PILLAR 04

EXPERIENCE

Occupant comfort, natural illumination, material health, biophilia, and long-term durability under intense use.

VALUE UNLOCK

Sometimes the Opportunity Is in the Property You Already Own.

VALUE UNLOCK

Acquiring new square footage is frequently less accretive than strategically transforming an existing, underutilized floor plate. MAVEX models repositioning ROI before architectural capital is deployed.

BASELINE AUDIT EXISTING ASSET
  • close Fragmented compartmental floor layouts yielding poor functional density.
  • close Outdated MEP services creating recurring operating expenses and leak liabilities.
  • close Depreciated aesthetic finishes suppressing institutional tenant rental benchmarks.
  • close Non-compliance with contemporary life safety and fire sprinkler code updates.
VALUATION TRAJECTORY

Sub-optimal Yield · Depreciating Capital Multiple

TRANSFORMATION AUDIT REPOSITIONED USE
  • check Rationalized structural grid maximizing usable core and daylight ingress.
  • check High-efficiency VRF ventilation, acoustic zoning, and smart metering integration.
  • check Quiet luxury architectural vernacular commanding top-tier institutional lease covenants.
  • check Full statutory clearance, MahaRERA compliant modifications, and green rating readiness.
VALUATION TRAJECTORY

Enhanced Rental Yield · Upgraded Capital Liquidity

RISK MITIGATION DISCIPLINE

A Clear Brief Reduces Ambiguity Later.

RISK MITIGATION DISCIPLINE

Cost blowouts and timeline slippage in construction are seldom caused by site craftsmanship; they stem from vague design deliverables and ambiguous trade agreements before the first hammer swings.

PRE-EXECUTION CHECKLIST BOUNDARIES
01

SCOPE

Definitive bounds of demolition and works

02

REQUIREMENTS

Load schedules & user functional criteria

03

MATERIALS

Pre-approved spec sheets & vendor mockups

04

DELIVERABLES

GFC drawing sheets & detail shop drawings

05

BUDGET

Itemized line-item BOQ with quantity locks

06

RESPONSIBILITY

RACI matrix across all trade contractors

07

DEPENDENCIES

Trade sequencing & site access conditions

08

TIMELINES

Critical path schedules with buffer buffers

09

APPROVAL POINTS

Client milestone gate reviews prior to financial release

“The objective is not to eliminate every change. It is to make important decisions visible before they become execution problems.”

FINANCIAL GOVERNANCE

Budget Numbers Need Context.

TIER 01

BUDGET ESTIMATE

Initial Planning Figure

High-level parametric square-foot cost benchmarking based on project typologies and target finishes.

TIER 02

QUOTATION

Commercial Proposal

Contractor market bid based on preliminary drawings and outlined Bill of Quantities schedule.

TIER 03

APPROVED SCOPE

Agreed Baseline Contract

Binding contract sum tied strictly to GFC (Good-For-Construction) specifications, terms, and retention.

TIER 04

VARIATION

Documented Change Order

Any addition or deletion must be approved in writing with unit-rate validation prior to execution on site.

SYSTEMATIC EXECUTION

A Structured Path From Idea to Execution.

SYSTEMATIC EXECUTION
01

Understand

Client objectives, capital bounds, and real estate parameters.

02

Assess

Structural audit, physical constraints, and site measurements.

03

Brief

Synthesizing requirements into a single immutable project brief.

04

Design

Spatial architecture, mood directions, 3D layouts, and materiality.

05

Scope

Line-by-line deliverables schedule and trade packages.

06

Budget

BOQ signoff, procurement benchmarking, and contingency buffer.

07

Coordinate

Architects, engineers, MEP specialists, and vendors alignment.

08

Execute

Milestone site audits, trade management, and quality control.

09

Review

Punch list rectification, snag audits, and operational tests.

10

Complete

Formal handover, as-built drawings dossier, and warranties.

COLLABORATIVE INFRASTRUCTURE

Different Projects Require Different Specialists.

COLLABORATIVE INFRASTRUCTURE

Real estate outcomes require the seamless convergence of diverse licensed disciplines. Rather than replacing these indispensable specialists, MAVEX coordinates their outputs toward the investor’s ultimate strategic thesis.

real_estate_agent

Property Owners

domain

Developers

architecture

Architects

engineering

Structural Eng.

hvac

MEP Consultants

gavel

Legal & Statutory

verified_user INSTITUTIONAL FIDUCIARY BOUNDARY

“MAVEX can provide strategic direction, advisory, coordination and project-management support within the agreed scope. It does not represent itself as the statutory authority or substitute for specialist professional responsibility.”

INVESTMENT TRACK
INVESTMENT TRACK

Design Can Be Part of an Asset Strategy

For value-add capital, thoughtful design is an active financial lever to re-rate yield, elevate capitalization rates, and capture premium leases from institutional occupants.

01. ACQUIRE Market Arbitrage
02. ASSESS Spatial Deficiencies
03. REPOSITION Architectural Remodeling
04. IMPROVE MEP & Spec Upgrades
05. LEASE / OCCUPY / SELL Yield Alpha
Explore Investment & Asset Advisory arrow_forward
DEVELOPMENT TRACK

Execution Begins With the Development Strategy

Developers and landowners require build outcomes that strictly honor product-market fit, construction economics, and buyer absorption velocity from the very first sketch.

01. DEVELOPMENT OBJECTIVE IRR Target
02. TARGET MARKET Buyer Demographics
03. PRODUCT STRATEGY Unit Matrix & Amenities
04. SITE & PLANNING FSI & Approvals
05. CONSTRUCTION & EXECUTION Cashflow Governance
Explore Development & JV Advisory arrow_forward
FULL-CYCLE FIDUCIARY CONTINUUM

The Full Property Journey Can Stay Connected.

FULL-CYCLE FIDUCIARY CONTINUUM

Fragmented advice across disconnected professionals degrades asset value. MAVEX unifies land, capital, architecture, and construction under a single coherent advisory framework.

STAGE 01

LAND

Survey Line & Title

Zoning clearances, soil viability, and title underwriting.

STAGE 02

DEVELOPMENT

Massing & Permissions

Statutory FSI optimization and joint venture governance.

STAGE 03

DESIGN

Floor Plan & Spec

Spatial resolution, MEP schematics, and finish standards.

STAGE 04

BUILD

Structural Grid & Fitout

Milestone monitoring, quality benchmarks, and contractor coordination.

STAGE 05

ASSET

Finished Architecture

Yield generation, operational efficiency, and exit valuation.

EXECUTION ALIGNMENT

Design Creates the Plan. Project Management Helps Keep Execution Aligned.

EXECUTION ALIGNMENT

Without rigorous project management, even the most exquisite architectural intent gets compromised during trade handoffs. We maintain continuous oversight of physical milestones.

SEVEN COORDINATION LAYERS Explore Project Management →
LAYER 01

Design

LAYER 02

Scope

LAYER 03

Stakeholders

LAYER 04

Timeline

LAYER 05

Issues

LAYER 06

Decisions

LAYER 07

Handover

“What has been agreed should remain visible throughout execution.”

AUDITABILITY & INTEGRITY

Clear Scope. Clear Responsibility. Clear Decisions.

AUDITABILITY & INTEGRITY

High-capital real estate decisions demand complete evidentiary trails. We enforce rigorous documentation across five core layers:

01

CLIENT DECISION

Explicit written approval on scope, budgets, and milestone signoffs.

02

DESIGN DECISION

Architectural drawing revisions locked before shop drawing issuance.

03

PROJECT ASSUMPTION

Documented site parameters, load limits, and building society bylaws.

04

CONTRACTOR SCOPE

Strict delineation of trade packages with penalty/retention clauses.

05

MAVEX COORDINATION

Fiduciary site audits, progress reconciliation, and dispute prevention.

FIDUCIARY TRANSPARENCY CHARTER

Design & Build Requires Clear Professional Responsibility.

MAVEX Strategic Advisory Role

  • • Strategic property alignment and yield optimization
  • • Comprehensive brief structuring and trade matrix design
  • • Value engineering and itemized BOQ parameter review
  • • Independent milestone auditing and progress reporting

Specialist Professional Responsibility

  • • Structural engineer stamping and load-bearing liabilities
  • • Licensed MEP engineer electrical and hydraulic schematics
  • • Municipal and statutory planning authority approvals
  • • Contractor physical workmanship, warranty, and labor law liabilities
FIDUCIARY DEMARCATIONS: MAVEX DOES NOT PROMISE
• No guaranteed project costs independent of market variance or scope changes.
• No guaranteed completion dates without client stakeholder milestone sign-offs.
• No guaranteed statutory approvals outside official municipal authority review.
• No guaranteed contractor performance without independent trade enforcement.
• No speculative guaranteed appreciation independent of broader macro trends.
MICRO-MARKET GOVERNANCE

Design & Build Is Also a Location Decision.

MICRO-MARKET GOVERNANCE

Executing architecture in Navi Mumbai requires specialized knowledge of regional regulatory authorities and environmental micro-climates. We navigate specific institutional frameworks across all major growth corridors.

Explore Navi Mumbai Intelligence arrow_forward
NMMC JURISDICTION

Municipal Structural Clearances

Vashi, Belapur, and Palm Beach Road structural alteration guidelines, society NOC bylaws, and commercial facade codes.

CIDCO LEASEHOLDS

Lease Terms & Transfer Protocols

Navigating CIDCO 60-year leasehold clauses, change-of-user permissions, and transfer fee parameters before remodeling.

NAINA TOWN PLANNING

Airport Influence Zone (NMIA)

Aerotropolis building height clearances, Town Planning Scheme (TPS) infrastructure linkages, and logistics zoning.

COASTAL MICRO-CLIMATE

Monsoon & Salinity Engineering

Waterproofing systems, anti-corrosive marine-grade hardware, and UV-resistant glass specifications for waterfront assets.

CLIENT PROFILES

Who This Service Is For.

CLIENT PROFILES
01

Property Owners

Upgrading, expanding, or renovating private residences and estates.

02

Investors

Repositioning underperforming acquisitions to boost rental yield.

03

Landowners

Evaluating spatial built concepts to maximize land parcel valuation.

04

Developers

Aligning sales pavilions, model units, and lobbies with buyer appetite.

05

Commercial Clients

Delivering headquarters, retail stores, and agile workplaces on schedule.

06

NRI Clients

Remote governance, digital milestone audits, and transparent financial controls.

07

Societies & Stakeholders

Facilitating redevelopment feasibility, common space upgrades, and consensus briefs.

INTELLIGENCE ARCHIVE

Design & Build Knowledge Hub

Access Whitepapers arrow_forward

BOQ Preparation & Vendor Due Diligence

How to format contractor bill of quantities to prevent undocumented rate escalation and false variations.

MahaRERA & Structural Remodeling Norms

Understanding statutory fire, load-bearing, and plumbing permissions in cooperative housing societies.

Remote Execution Framework for Global NRIs

Structuring escrow draw schedules tied strictly to 3D video milestone verifications and quality signoffs.

DUE DILIGENCE

FAQ

DUE DILIGENCE

Essential inquiries regarding our advisory engagement model, vendor neutrality, financial governance, and remote oversight.

No. MAVEX provides end-to-end design & build advisory. This spans initial asset feasibility, spatial planning, structural assessment coordination, architectural concept design, BOQ cost governance, specialist contractor vetting, and physical milestone monitoring through to final snag-free handover.
Yes. MAVEX regularly serves as the client’s representative and fiduciary advisor. In this capacity, we coordinate with your chosen architect, structural engineer, or builder, enforcing project schedules, verifying quality benchmarks, and evaluating payment certifications against on-site completion.
We operate through a 4-tier cost architecture: Budget Estimate → Quotation → Approved Scope → Variation. Before work commences, every item is broken into a line-by-line Bill of Quantities (BOQ). Scope creep is controlled by enforcing mandatory written client authorizations for any deviation.
Our portfolio covers ultra-prime private residences, Grade-A corporate headquarters, commercial flagships, institutional sales experience centres, society redevelopment common areas, and underperforming commercial assets undergoing capital repositioning.
Traditional turnkey contractors frequently bundle design, materials, and labor into an opaque lump sum, creating an inherent incentive to cut material specifications or introduce expensive variations later. MAVEX acts as an independent fiduciary, unbundling trade packages and ensuring transparent competitive bidding without material markups.
For international and non-resident clients, we implement structured digital reporting: bi-weekly video audits, 360-degree site scans, milestone documentation sign-offs, and rigorous financial drawdown reconciliations before any contractor disbursements are approved.
Ideally at the initial property acquisition or concept phase. Early involvement allows us to assess physical floor plate constraints, MEP capacities, and statutory municipal guidelines before purchase commitments or lease agreements are formalized.
No. MAVEX provides disciplined management, proactive risk identification, and strict contractual milestone monitoring. However, statutory delays, municipal approval cycles, unforeseen structural realities, and third-party contractor default risks remain the legal responsibility of their respective statutory bodies and contracted entities.
INITIATE AN ADVISORY ENGAGEMENT

Have a Property That Needs to Become Something More?

INITIATE AN ADVISORY ENGAGEMENT

Whether it is a home, commercial space, investment property or development project, begin with the property strategy and build from there.

MAVEX REALTY™ · Strategy · Design · Coordination · Execution Institutional Real Estate & Physical Asset Advisory
ADVISORY
  • Private Wealth
  • Land & JV
  • Design & Build
  • Project Mgmt
  • Asset Repositioning
SECTORS
  • Ultra-Prime Residential
  • Grade-A Commercial
  • Retail Flagships
  • Logistics & Industrial
  • Hospitality Assets
NAVI MUMBAI
  • Palm Beach Road
  • Kharghar Valley
  • Ulwe Waterfront
  • NMIA Aerotropolis
  • Belapur CBD
INTELLIGENCE
  • Yield Monitor Q4
  • BOQ Control Guide
  • MahaRERA Analysis
  • CIDCO Leasehold FAQ
  • Monsoon Specs
PRACTICE
  • Quiet Luxury Charter
  • Fiduciary Mandate
  • NRI Concierge Desk
  • Methodology
  • Team & Partners
LOCATIONS
  • BKC Private Lounge
  • Vashi Advisory Suite
  • Dubai DIFC Desk
  • Singapore Liaison
  • London Advisory
MahaRERA Reg No: A031332600468 • Government of Maharashtra
© 2025 MAVEX REALTY. All rights reserved. Strictly confidential.
Scroll to Top